Search
A glass bus shelter and wood bench beside a landscaped, rain-darkened Mill Creek-style town-center street in late autumn.

Light Rail Is Coming North. Mill Creek's Way Onto It Is Still the Bus.

On October 13, Sound Transit set up map boards in Mariner High School for an open house on the Everett Link light rail extension. People studied the proposed route and station locations for the 16-mile line from Lynnwood to Everett, and staff answered questions about timelines and property acquisition, the Everett Herald reported.

The line has six funded stations: West Alderwood, Ash Way, Mariner, SW Everett Industrial Center, SR 526/Evergreen and Everett Station, plus one provisional, unfunded stop at SR 99/Airport Road. None of them is in Mill Creek. If you're weighing Mill Creek against Lynnwood, Bothell or south Everett, "near light rail" means something specific here. Your rail access runs on two bus corridors and a limited supply of parking stalls, and it will keep working that way well after Everett Link opens.

The Direct Seattle Bus Already Ends at Lynnwood

Commuters coming from out of state are often surprised by this. Mill Creek no longer has a one-seat bus ride to downtown Seattle. When Community Transit restructured its network in September 2024, it discontinued its 400- and 800-series express routes to Seattle and Northgate, including Routes 402, 405, 410, 412, 413, 415 and others. Route 412 used to run from Silver Firs through Mill Creek and nonstop to downtown Seattle. It was replaced by Route 901, which runs only at morning and afternoon peaks and ends at Lynnwood City Center Station, Seattle Transit Blog reported at the time.

Community Transit's current Mill Creek guide lists six routes serving the area: 106, 109, 166, 901, Swift Green and Swift Orange. To reach Seattle from any of them, you transfer to Link. The Everett extension won't change that. It moves the transfer point north, eventually, and that's all.

Swift Orange Is the Line Doing the Work

The route that matters most is Swift Orange, Route 703. Community Transit launched it on March 30, 2024. It runs between Edmonds College and McCollum Park Park & Ride, with a stop at Lynnwood City Center Station. Its Mill Creek-area stations, as listed on the Route 703 page, are:

  1. 164th St SE NB
  2. 153rd St SE NB
  3. Trillium Blvd NB
  4. McCollum Park Park & Ride, Bay 4

Community Transit lists Swift buses every 10 minutes at weekday peak and every 15 to 20 minutes early in the morning and in the evening, with weekday service from 4 a.m. to midnight. When Lynnwood Link opened in 2024, Seattle Transit Blog estimated the ride from Lynnwood City Center at about 27 minutes to Mill Creek and 16 minutes to McCollum Park. At Lynnwood City Center, the 1 Line goes toward downtown Seattle and the 2 Line toward Bellevue and Redmond.

The second corridor is Swift Green, Route 702, which runs between Seaway Transit Center and Canyon Park Park & Ride in Bothell. It stops in Mill Creek along the way. Today it's a local corridor and doesn't stop at a Link station. That changes once Everett Link is built, because both Swift lines run past the places where the new stations could go.

Where the Nearest Future Stations Could Land

The two Everett Link stations closest to Mill Creek are Ash Way and Mariner. Both still have two alternatives in play, and Sound Transit has not identified a preferred alternative for either segment.

Segment Alternative Station location Mill Creek bus corridor that reaches it
Ash Way ASH-1A By Ash Way Park-and-Ride, west of I-5 Swift Orange, along 164th Street SW
Ash Way ASH-2D Near 164th Street SW and Motor Place, east of I-5 Swift Orange, along 164th Street SW
Mariner MAR-1B South side of 128th Street SW at 8th Avenue W Swift Green, along 128th Street SW
Mariner MAR-2D North side of 128th Street SW, across from Mariner Park-and-Ride Swift Green, along 128th Street SW

All the stations in both segments would be elevated. Sound Transit's Ash Way materials also mention a partially funded Snohomish County plan for a new multimodal crossing of I-5 north of 164th Street SW.

Whichever alternatives win, the result is the same for Mill Creek. The future stations sit along the 164th and 128th corridors to the west, and Mill Creek reaches them by Swift. Choosing between ASH-1A and ASH-2D decides which side of I-5 the Orange Line transfer happens on. It doesn't bring a rail stop to Mill Creek.

Parking Is the Part That Got Deferred

For Mill Creek households that plan to drive to the train, the most consequential detail in the Draft Environmental Impact Statement is about parking. Sound Transit is studying about 550 new parking spaces at Mariner, but final design and construction of that parking is deferred. Mariner and Everett Station are the two places on the line where Sound Transit has deferred parking. At Ash Way, the existing park-and-ride west of I-5 would remain the area's parking facility.

Lynnwood shows why this matters. Sound Transit's garage at Lynnwood City Center is a five-story structure with 1,670 stalls. In November 2024, a few months after the station opened, the Herald reported that the garage was full by 8:30 a.m. on a Tuesday, and Sound Transit said it was at or above capacity most days. Sound Transit's parking permit page lists only free carpool permits for Lynnwood, not paid single-occupant permits. Permit zones are held for permitted vehicles from 4 to 10 a.m. on weekdays, and carpool permit holders must arrive with at least two transit riders.

Closer to home, McCollum Park Park & Ride has 401 car stalls, according to Community Transit's 2025–2030 Transit Development Plan, adopted in August 2025. It's the Swift Orange terminus, so a driver who parks there boards at the start of the line. To the south, Community Transit says the pedestrian bridge and the Sound Transit southbound flyer stop at Canyon Park Park & Ride in Bothell are closed until 2028. Temporary stops for ST 532 and 535 are in place, and the Swift Green station stays open.

So the bus is how Mill Creek reaches the train today. Under current plans, it will still be the most dependable way to reach the nearest new stations once they open, because the parking near them is either an existing lot or not yet funded for construction.

The Calendar Behind a Purchase Made This Winter

Sound Transit's Board adopted an updated system plan on May 28, 2026, while working through an agency-wide funding shortfall. Everett Link stayed fully funded and on its existing timeline. These are the milestones that matter for a home bought in Mill Creek this season:

  • Early 2027: The Board is expected to confirm, modify or identify preferred alternatives after the Draft EIS comment period, which closed November 2. The Herald reported that the vote could come as soon as January 2027.
  • Late 2027 or early 2028: The Final EIS is expected.
  • 2028: Sound Transit officials said this is when they'll know exactly which properties need to be acquired.
  • 2030: The earliest year construction could start.
  • 2037: Projected opening of the first segment, from Lynnwood City Center to SW Everett Industrial Center, which takes in Ash Way and Mariner.
  • 2041: Projected opening of the northern segment to SR 526/Evergreen and Everett Station.

The Herald described the extension as an $11.6 billion project. Once it opens, Sound Transit projects trains every 4 to 6 minutes at peak and 10 to 15 minutes midday, evenings and weekends.

Someone buying in Mill Creek this winter could live in the house for a decade before the first Everett Link train runs. Over that decade, the transit facts that shape daily life for a particular address are already known. How far is the walk to a Swift Orange station on the Bothell-Everett Highway corridor? How far is the drive to McCollum Park? How does that compare with the Swift Green stops? If you're comparing a Mill Creek home with one in Lynnwood or near Ash Way, put those measurements next to each other, because they will still describe your commute after the Board votes in 2027.

When we help relocating clients compare addresses, we map the actual door-to-platform route for each one. Our relocation assistance process includes this, alongside the neighborhood overviews for Mill Creek and Bothell.

Quick Answers

Will Everett Link have a station in Mill Creek? No. The planned stations are West Alderwood, Ash Way, Mariner, SW Everett Industrial Center, SR 526/Evergreen and Everett Station, with a provisional, unfunded stop at SR 99/Airport Road.

Is there still a direct bus from Mill Creek to downtown Seattle? None of the routes on Community Transit's current Mill Creek list runs to downtown Seattle. Route 901, which replaced the old Route 412, ends at Lynnwood City Center Station.

Can I count on parking at the future Mariner station? Sound Transit is studying about 550 spaces there, but final design and construction of that parking is deferred.

If a commute to Seattle, Bellevue or Paine Field is part of your move, Becca Locke can help you test each address you're considering against the Swift stations and park-and-rides that will carry that commute for years to come. Start Your Search with the route in hand.

Work With Becca

Whether you're buying your first home, selling the one you've outgrown, or relocating to the Snohomish County area, you deserve an advisor who knows this market from the inside out. I've lived in Mill Creek for 13 years, sold 500+ homes across the greater Puget Sound region, and built a practice around one thing: making sure my clients make confident, informed decisions. Whether you're a first-time buyer navigating a competitive Snohomish County market, a homeowner ready to sell and move on, or relocating to the Pacific Northwest and trying to figure out where to land, I bring the same thing to every situation: deep local knowledge, honest guidance, and a process that keeps you informed from start to finish.

Follow Me